- A Level crossing with gates
- B Level crossing without gates
- ✓ Tramway crossing
- D Advance sign for level crossing, movable bridge or quay (200 metres, right side)
Why this is the correct answer
Danger due to the proximity of a crossing with a tram line which has priority.
Ready to pass the DGT theory test?
Practise official-format questions in English, with explanations after every answer and full progress tracking.
Try a free practice test